NRF/SAASTA BULD/45/2024-25

NRF/SAASTA BULD/45/2024-25
Bid Number: NRF/SAASTA BULD/45/2024-25
Bid Description: THE APPOINTMENT OF A CIDB GRADE 3 SO (OR HIGHER) CONTRACTOR FOR THE DECOMMISSIONING AND REPLACEMENT OF THE WATER PIPES SYSTEM AND INSTALLATION OF WATER CONTINGENCY AT DIDACTA BUILDING PRETORIA CENTRAL
Closing Date & Time: 15 November 2024, 11:00AM
Compulsory Briefing Session:
Venue:
Address:
Availability of additional information:
28 October 2024 at 11:00-12:00PM

NRF-SAASTA, DIDACTA BUILDING: AUDITORIUM

211 Nana Sita Street; Pretoria Central
Bidders attending briefing session will be provided with details of the required renovations at this meeting including a site-walk.

NB: Bidders who fail to attend the compulsory briefing will be disqualified from the bidding process.

Bid documents are available on the following websites: www.saasta.ac.za;
www.nrf.ac.za;
www.etenders.gov.za
Bid Submission Address: Bids must be submitted in two separate electronic folders, one with the compliance and technical response, and the second with the financial response (SBD3.2).
The financial response must be password protected. Attachments are limited to 20 MB per email. Refer Annex A

Please submit into the email bid box Bid45.20242025@saasta.nrf.ac.za

Bids Labelling: Folders must be titled with the bidder’s company name, Bid Number, and folder title i.e. Proposal Folder and SBD3.2 Price Folder
Bidding procedure and technical enquiries are directed in writing to: Supply Chain Management
Ms. Tumelo Mothupi
TF.Mothupi@saasta.nrf.ac.za

Full document below:

Attachments

DRAWING-7-GROUND-FLOOR-DOMESTIC-HOT-COLD-WATER-LAYOUT-VO1-DW-04.pdf DRAWING-8-GROUND-FLOOR-INTERNAL-DRAINAGE-LAYOUT-VO1-ID-05.pdf
DRAWING-9-BASEMENT-HOT-COLD-WATER-LAYOUT-VO1-DW-08.pdf DRAWING-10-BASEMENT-INTERNAL-DRAINAGE-LAYOUT-VO1-ID-09.pdf
DRAWING-11-ABLUTION-BLOCK-DOMESTIC-HOT-COLD-WATER-LAYOUT-SHEET-1-OF-2-VO1-DW-00.pdf DRAWING-12-ABLUTION-BLOCK-DOMESTIC-HOT-COLD-WATER-LAYOUT-SHEET-2-OF-2-VO1-DW-01.pdf
DRAWING-13-ABLUTION-BLOCK-INTERNAL-DRAINAGE-LAYOUT-SHEET-1-OF-2-VO1-ID-00.pdf DRAWING-14-ABLUTION-BLOCK-INTERNAL-DRAINAGE-LAYOUT-SHEET-2-OF-2-VO1-ID-01.pdf
DRAWING-1-MAIN-ROOF-DOMESTIC-HOT-COLD-WATER-LAYOUT-VO1-DW-12.pdf DRAWING-2-MAIN-ROOF-DOMESTIC-INTERNAL-DRAINAGE-LAYOUT-VO1-ID-13.pdf
DRAWING-3-SECOND-FLOOR-DOMESTIC-HOT-COLD-WATER-LAYOUT-VO1-DW-10.pdf DRAWING-4-SECOND-FLOOR-INTERNAL-DRAINAGE-LAYOUT-VO1-ID-11.pdf
DRAWING-5-FIRST-FLOOR-DOMESTIC-HOT-COLD-WATER-LAYOUT-VO1-DW-06.pdf DRAWING-6-FIRST-FLOOR-INTERNAL-DRAINAGE-LAYOUT-VO1-ID-07.pdf
Related Posts